Foundation Drilling Feature Story: Alissa Maxwell Weiss is a third generation – and first female – President of Hub Foundation Co., Inc.
The Encore Boston Harbor Casino is located on a 32-acre property, formerly the site of a large chemical plant.
Alissa Maxwell, President of Hub Foundation, was recently inducted into The Moles.
Hub Foundation Company used a Bauer MC 96 Duty-Cycle Crane with a BC 35 Trench Cutter and a Bauer MAT DE 500-20 Slurry Handling System to put in the foundations for a residential tower at Bullfinch Crossing in Boston.
The German Trinity Catholic Church and micropiles have “come together” to extend the life of a very beautiful Roxbury Puddingstone and Maine Granite structure that was originally completed in 1874.